Sputter Deposition, Evatec Clusterline 200 - Status: Down

Evatec Clusterline 200

Sputter Deposition wiki link
Microfabrication wiki link
Latest Status Log EntryApr 19, 2024 - User Note: restart system after tool shut itself off

To select the time for your reservation, click on the calendar at the desired start time and drag to the desired end time. If you are logged in, the reservations will display the names of the reservation users. Note: If the calendar is down, the following link may also be used to create a reservation: Create Reservation (Quick Form)

Calendar ICS Path

An active Gatorlink login is required to create a new reservation.